RoofRainYield

Palos Verdes Estates, CA rainwater: 9,792 gallons off a roof

How much rain a roof in Palos Verdes Estates, CA collects

9,792gallons a year

That is a 1,500 sq ft asphalt roof under Palos Verdes Estates, CA's normal 12.3 inches of rain, about 795 gallons for every inch that falls.

Palos Verdes Estates, CA's rain arrives in a wet season and stops, so storage is what matters. It takes a cistern of 5,000 gallons to carry spring rain into the dry months.

Rainfall: NOAA 1991-2020 climate normals, the Palos Verdes Es Fc43d station (2.7 mi away). Palos Verdes Estates, CA ranks 262nd wettest of the 376 cities covered in California.

Month by month in Palos Verdes Estates

MonthRain (in)Off the roof (gal)Garden shortfall (gal)
Jan3.072,440
Feb3.122,480
Mar1.891,502
Apr0.63501464
May0.21167516
Jun0.0648535
Jul0.0432537
Aug0.018541
Sep0.0756534
Oct0.52413478
Nov0.66525
Dec2.041,621

Feb is the wettest month (3.12 in, 2,480 gal off the roof); Aug the driest (0.01 in). Garden shortfall is what a 200 sq ft vegetable bed needs beyond the rain that lands on it, April to October.

Which tank size is worth it in Palos Verdes Estates

Best fit: a 5,000-gallon cistern, which delivers about 3,557 gallons to the garden in a normal year (98.7% of its need).

Before you buy, ask about a rebate first: cistern-sized storage costs real money, and a buried or tall tank may need a permit. Place it where a full tank (about 8.3 lb a gallon) sits on firm, level ground.

TankWater used (gal/yr)Spills over (gal/yr)
55 gal2209,129
110 gal4408,909
165 gal6478,702
275 gal8908,459
550 gal1,1658,184
1,000 gal1,6157,734
1,500 gal2,1157,234
2,500 gal3,1156,234
5,000 gal3,5575,792

Simulated storm by storm through a normal year using the station's count of days with 0.1 in or more of rain each month.

Is rainwater collection legal in California?

Legal. Use of rainwater collected from rooftops does not require a water right permit (Rainwater Capture Act of 2012, Water Code 10570 et seq.). The Act does not change existing water rights; local building/plumbing codes still apply to installed systems.

Checked against the current source on 2026-11-06. Source